Plus: Breaking the building into blocks that could be replicated made the planning ore manageable; trade foreman input regarding duration planning.
Delta: Prepare reference drawing designating areas and labeling for areas and post.
Plus: Breaking the building into blocks that could be replicated made the planning ore manageable; trade foreman input regarding duration planning.
Delta: Prepare reference drawing designating areas and labeling for areas and post.
Tom is a frequent speaker, workshop facilitator, panel discussion presenter, and university guest lecturer on topics of collaborative productivity, team culture and alignment, lean management, and project leadership. He lives outside Boston with his wife. Their daughter is a stage management major at Ithaca College.