Plus: Pre-fab / pre-packaged kits for pipe and conduit; Man-lift accessible for deliveries; Trimble for layout; Loading area has fall protection; Double trash chute on all floors; Screed off excess fireproofing at top of track; Intumescent strips at top track; Used buggy to catch can knockouts from above and used pipe with buggy to direct debris into buggy; Grind down nut driver for no-hub band; Metal stud typical attachments on mock up board.
Delta: Install second man-lift; Fix trash chute; Add more ramps into building.