Challenge Unspoken Assumptions Regarding Problems

Posted by Tom Richert Lean Projects
  • Share
  • Tweet

extension-cord-764787_1280I observed a great example of a project superintendent seeing beyond an unspoken assumption regarding a problem on the project. The issue being discussed was how the project could minimize safety hazards related to electrical extension cords.

The discussion included recommendations on how to keep cords off the floor, storing unused cords and other measures centered around how to better handle extension cords.

In the midst of the discussion the superintendent challenged the team figure out how to eliminate extension cords altogether. Rather than spend time determining how to better work around a hinderance and safety risk just eliminate it all together.

This will require work. But it resets the standard sought and when finally worked out will represent a major improvement in safety and productivity.

Share this:

  • Click to share on X (Opens in new window) X
  • Click to share on Facebook (Opens in new window) Facebook

Related

Share
0

About Tom Richert

Tom is a frequent speaker, workshop facilitator, panel discussion presenter, and university guest lecturer on topics of collaborative productivity, team culture and alignment, lean management, and project leadership. He lives outside Boston with his wife. Their daughter is a stage management major at Ithaca College.

You also might be interested in

Where “Respect for People” is Taking Lean

Dec 6, 2016

I learned about Lean – like most other people –[...]

Design Team Bi-Weekly Planning Coordination Meeting Plus Delta

Dec 12, 2016

Plus: Team used a better method of building and discussing[...]

Weekly Coordination Meeting Plus-Delta

Mar 18, 2016

Plus: Meeting started on time and completed early; participation by new[...]

Contact Tom

Send an email and I'll get back to you within 12 hours.

Send Message

Recent Articles

  • How To Energize Decisionmaking: A Framework For Project Success
  • Designing For Success: How Early Efforts Drive Quality In Capital Projects
  • How to Use Percent Plan Complete to Deliver Projects Faster
  • How to Develop Awesome Internal Project Performance Coaching Results
  • Wiring Winning Projects in a Sizable Industry and Looming Workforce Decline

© 2025 · Tom Richert.

Prev Next
     

    Loading Comments...